| APS 361 Price Work Sheet |
|
All Prices in US Dollars |
| Prices good until 08/18/2004 |
|
|
|
|
| Component |
Number Required |
Wholesale Unit Cost |
Wholesale Price |
Suggested Retail |
| 18"Hx18"Wx12"D Nema 4 SS Panel |
1 |
833.33 |
833.33 |
1166.67 |
| Advantec 12.1 TFT Color TS Computer |
1 |
3337.83 |
3337.83 |
4672.97 |
| 24VDC Power Supply |
1 |
500.00 |
500.00 |
700.00 |
| Adam Modules |
|
|
|
0.00 |
| Adam 4520 |
1 |
416.67 |
416.67 |
583.33 |
| Adam 4017 |
1 |
333.33 |
333.33 |
466.67 |
| Cooling System For Panel |
1 |
500.00 |
500.00 |
700.00 |
| Terminal Blocks, Switches and Accessories |
1 |
416.67 |
416.67 |
583.33 |
| Quadbeam MSSD33 Transmitter |
1 |
1838.33 |
1838.33 |
2573.67 |
| Quadbeam S20-3HY-880-PP-1-CA |
1 |
3833.33 |
3833.33 |
5366.67 |
| Transmission Cable 100 feet |
1 |
208.33 |
208.33 |
291.67 |
| Ground Fault Power Plug |
1 |
33.33 |
33.33 |
46.67 |
| Shipping: |
1 |
250.00 |
250.00 |
250.00 |
|
|
|
|
|
| Total Parts: |
|
|
12,501.17 |
17,401.63 |
|
|
|
|
|
| Startup and Training ($600.00/Day) |
5 |
600.00 |
3000.00 |
3000.00 |
| Travel 1 Trip Airfare ($500.00) |
1 |
500.00 |
500.00 |
500.00 |
| Hotel $85.00 / Night |
5 |
85.00 |
425.00 |
425.00 |
| Rental Car $75.00/Day |
5 |
75.00 |
375.00 |
375.00 |
| Food and Parking |
5 |
60.00 |
300.00 |
300.00 |
| Misc. |
1 |
2000.00 |
2000.00 |
2000.00 |
|
|
|
|
|
| Total With Labor Startup: |
|
|
19,101.17 |
24,001.63 |
| |
|
|
|
|
| Available Options: |
|
|
|
|
|
Endress & Hauser Flow Meter to display rate accumulation |
1 |
|
3465.60 |
4158.72 |
| *(Includes cables and Software modification) |
|
|
|
|
| Advantec Control of Vitamin Pump System |
1 |
|
480.00 |
576.00 |
| *(Includes cables and Software modification) |
|
|
|
|
| |
|
|
|
|
|
Customer Provides: |
|
|
|
|
| 1. All electrical conduits and control wire installation |
|
|
|
|
| 2. Qualified Plant Engineer during Startup and Training to be in house
specialist |
|
|
|
|
| 3. Source of Clean 120 AC Volts with 8 Amp breaker |
|
|
|
|
| 4. Operator training period for 30 minutes before his or her shift begins |
|
|
|
|
| 5. Safe location for Advantec Panel far enough away from Balance Tank |
|
|
|
|
| and sources of Chemical Gases |
|
|
|
|
| 6. Laboratory Instrument for calibration of Advantec to Master Butterfat
Values |
|
|
|
|
| 7. Laboratory technician and Senior Operator for the Advantec to train
other |
|
|
|
|
| Operators and act as contact to Advantec |
|
|
|
|
| 8. All Piping, welding and other installation components |
|
|
|
|
| for the Advantec Panel, Sensors and Flow Meter installation |
|
|
|
|
|
|
|
|
|